A) |
For Construction Sanctions |
1. |
Application in prescribed form (Developement permissiondemand application form no.1852) |
2. |
Owner-ship right 7-12;property card,co-op .housing soc certificate |
3. |
Detailed scaled survey map. |
4. |
Development project area map. |
5. |
Construction detailed plans etc.(5 copies) |
6. |
Supervision certificate (B form) from autherised architecture /engineer. |
7. |
Bond on Rs.50/-stamp-paper in case.The basement is proposed /existed. |
8. |
Bond & difficult regarding urban soaling. |
9. |
Certificate of structural stability if required |